About JBR Engineering
JBR Engineering was established in 1980. Upon inception JBR has been manufacturing electronic assemblies, wound toroids, inductors, chokes, coils, etc. As a result, our customers rely on us to purchase the materials needed ahead of time so that we can provide them with the “Just-In-Time” delivery when needed.
Working off our customer’s MRP’s or production schedules, we realized that we could broaden our structure to meet other manufacturing companies needs while helping them cut their human resource dollars overhead expense. And at the same time we can allow them the peace of mind knowing that their materials will be at their production line when they are needed.
JBR has the experience of working with MRP’s and material needs for over 25 years. This puts us in an excellent position to know exactly how to control and manage your inventory needs.
JBR maintains a minimum weekly supply (based upon agreement) of materials at each of your manufacturing locations, and if need be, our facility in New York State. The quantities are established using your MRP’s or production schedule on a weekly basis.
Materials would be purchased only from your designated approved vendors.
JBR is responsible to Plan, Purchase, and Distribute your materials necessary for manufacturing |